33. Reassemble pump box.
34. Insert pump box and control boxes into the diffractometer housing. See 16-18.
35. Reattach all cables and hoses. See 3.
36. Turn on shield gas. See 13.
37. Remove the shunt and reattach heat exchanger hoses. See 10-12.
38. Reinsert transfer line into white Dewar. See 7-9.
39. Turn on silver feeder Dewar valve. See 6.
40. Plug in pump and control boxes. See 15.
41. Switch on controller. See 5.
42. Run the Kryoflex program and click on “refill” and “start”. See 4.